Integration guides · November 13, 2026

Katana MRP EDI Integration: The Complete Guide

Connecting Katana MRP to retail EDI — wholesale 850s as Katana sales orders, make-to-order visibility, ship confirms driving the 856, and the 810 invoice.

Katana is the manufacturing platform for companies that make real things at human scale — the coffee-roaster-turned-wholesale-brand, the furniture workshop, the cosmetics maker whose production board finally outgrew the spreadsheet. Those are exactly the companies that get the phone call every founder wants: a retail chain or national distributor wants the product. The attachment on the follow-up email is an EDI routing guide, and it does not care that you are small.

The SMB manufacturer's EDI moment

Retail EDI mandates are sized to the retailer, not the supplier. A four-person brand shipping 40 wholesale orders a month faces the same document set as a 400-person one: 850 purchase orders in, 855 acknowledgments, 856 ASNs, and 810 invoices out, 997s both ways. Historically that mandate meant a provider quote with a monthly subscription and a four-figure setup project — a real barrier at maker scale. The economics have changed; more on that at the end.

Architecturally, the answer for a Katana shop is the same seam every ERP integration uses: Katana keeps owning products, materials, production, and fulfillment; the EDI layer owns translation, partner-specific validation, connectivity, and monitoring.

What maps to what

  • Inbound 850 → Katana sales order. The retailer's item numbers and UPCs cross-reference to your Katana products and variants, the ship-to resolves to the right location, and the order lands where your production planning can see it — which is the entire point for a make-to-order shop.
  • 855 out, from the schedule. This is the document where manufacturing reality lives. Katana shows what materials and capacity support; the 855 should commit that, not the optimistic version. Most majors expect the acknowledgment within 24 hours, and an honest 855 now beats an apologetic short-ship later.
  • Ship confirm → 856. When the order ships with tracking, the ASN transmits — before the freight arrives, with the carton hierarchy the partner requires. EDISQ includes GS1-128 labels free, with the SSCC-18 allocation shared between the label and the ASN's MAN segments, so the label-vs-document mismatch that plagues small suppliers cannot occur.
  • Invoice → 810, quoting the PO and as-shipped quantities so the retailer's match clears without a deduction.
  • Stock → 846 where a distributor or dropship program wants inventory feeds.

Setup effort concentrates in one place: the item cross-reference between the retailer's identifiers and your Katana catalog. Build it once, keep it in one table, and compliance mostly follows.

Going live without a project

The path fits inside a busy founder's week. Sign up self-serve — no sales call. Pick the partner from the directory; 2,200+ trading partners come with certified maps, so the companion-guide rules are configuration. Connect Katana (connectors are activated on request; CSV import/export is live immediately, which honestly covers a small brand's first months — export orders in, import shipment files out). Test in the sandbox against the partner's scenarios, then flip live with acknowledgment tracking on.

A note on growth: the first partner is the hard one. When the second chain arrives, Katana and your production workflow do not change — the new retailer is another map set on the EDI side. Brands that structure it this way go from one wholesale program to five without adding operations headcount.

Priced for maker scale

This is where the market has genuinely moved. EDISQ's meter starts at zero: the first 25 documents each month are free — which covers a small brand trading a handful of weekly orders indefinitely — then documents price from $0.50, tapering with volume, on the published ladder at the pricing page. No monthly fee on the Self-Serve plan, no per-partner setup projects, connectivity (AS2, VAN, SFTP) operated as part of the service. The retail invitation should be a growth story, not a systems procurement — the product tour shows how small the lift actually is.

FAQ

Does Katana MRP support EDI?

Katana focuses on manufacturing — production planning, materials, and floor-level scheduling. Retail EDI comes from pairing Katana with an EDI layer that converts partner documents into Katana sales orders and reads fulfillments back out as ASNs and invoices.

Why does a small manufacturer need EDI?

Because landing a retail or distributor account usually comes with an EDI mandate. The maker brand that gets picked up by a national chain has to trade 850s, 856s, and 810s like any large supplier — at whatever volume it currently ships.

How does make-to-order production fit the 855 acknowledgment?

The 855 confirms quantities and dates you can commit. Katana's production visibility — materials on hand, capacity, lead times — is what makes that answer honest, so acknowledge from what the schedule supports, not from hope.

What does Katana EDI cost with EDISQ?

Per document: first 25 each month free, then from $0.50 per document, tapering with volume. Connectivity and partner maps are included; there is no monthly fee on the Self-Serve plan.